$200,000,000.00 (price excluding tax)
The multi-stacked TRON GENSET has a capacity of 100,000,000 watts or 100 MWH, making it ideal for large AI data center applications. These generators can be arranged either side by side or stacked vertically, with each container producing 5 MWH. A centralized AI software platform manages all 20 TRON GENSETS, monitoring each component, signal, generator frequency, and RPM. Additionally, all TRON GENSETS are daisy-chained, allowing for easy adjustments to increase or decrease power output as needed.
In stock
Description
Description:
This multi-stack TRON GENSET® 100 Mega Watt or 100,000kW or 134,102 mechanical horsepower Permanent Industrial Silent AI Data Center Magnetic Energy Generator is ideal for large industrial Data Center and AI Artificial Intelligence applications. The multi-stacked TRON GENSET has a capacity of 100,000,000 watts or 100 MWH, making it ideal for large AI data center applications. These generators can be arranged either side by side or stacked vertically, with each container producing 5 MWH. A centralized AI software platform manages all 20 TRON GENSETS, monitoring each component, signal, generator frequency, and RPM. Additionally, all TRON GENSETS are daisy-chained, allowing for easy adjustments to increase or decrease power output as needed.
- Our generators are Magnetic NdFeB Energy Generators,
- Our Generators include Farday Cage Protection,
- Our Generators include Remote Controls, (monthly service plan)
- Our generator is completely silent,
- Our generator is completely green,
- Our generators have zero carbon emissions or pollutants emitted into the air,
- Our generators have a 5 year 100% warranty, with an extended warranty option of another 5 years,
- Our Direct-to-Metal (DTM) Acrylic/Enamel paint + contains ATMAG T45 steel flakes for extreme 100+ year protection.
With our generator, there is NO recurring monthly cost since it does not require fuel to run. It is a one-time purchase that frees you from energy costs for the life of the generator. Water and Osmosis filters must be replaced depending on the environment in which you are located. Speak to an engineer to ensure you get a great maintenance program.
In the event of a disaster when power is down and fuel is unavailable, our generators will keep running and keep your AI Data Center up and functional.
Since there are zero-emissions, our generators can be placed anywhere on the property within legal zoning ordinances.

Using your 2-unit parallel block as the constant, each block is 10 MWh if each unit is 5 MWh.
| Output target | 5 MWh units | 2-unit parallel blocks | Arrangement |
|---|---|---|---|
| 5 MWh | 1 | 0.5 block | 1 unit |
| 10 MWh | 2 | 1 block | 1 parallel pair |
| 20 MWh | 4 | 2 blocks | 2 parallel pairs |
| 50 MWh | 10 | 5 blocks | 5 parallel pairs |
| 100 MWh | 20 | 10 blocks | 10 parallel pairs |
| 150 MWh | 30 | 15 blocks | 15 parallel pairs |
| 200 MWh | 40 | 20 blocks | 20 parallel pairs |
Additional information
| US Standard 60 Hertz | US Standard 60 Hz |
|---|---|
| EMP Resistant | Container includes a Faraday Cage |
| Phases | 3 Phase as well as 1 Phase output controls |



